Skip to main content
FREE Delivery!|(301) 719-3485

Prince Georges County, Maryland ยท Free Delivery

Crushed Stone, Sand and Gravel in Glenn Dale, MD

Free delivery to Glenn Dale on every order, with loads arriving in as fast as 2 business days.

Delivering to Glenn Dale, MD

Free delivery on every order.

  • Free delivery to Glenn Dale
  • Order from 1 ton
  • As fast as 2 business days

Gravel delivered to Glenn Dale

Crushed gravel and base materials that compact under tires.

CR-6

3/4" minus blend compacted under roads and heavy-load areas

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Glenn Dale

Rock & Stone delivered to Glenn Dale

Graded crushed stone for drainage, concrete and heavy work.

RipRap

4" to 12"+ rock for shorelines, slopes and culvert outlets

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Glenn Dale

Decorative delivered to Glenn Dale

Rounded stone for beds, borders and water features.

Sand delivered to Glenn Dale

Washed sand for masonry, concrete and leveling.

Soil, Fill & Mulch delivered to Glenn Dale

Soil and fill by the ton, mulch by the cubic yard.

Fill Dirt

Compactable dirt for grading, backfill and low spots

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Glenn Dale

How delivery to Glenn Dale works

  1. 1

    Pick the material and quantity.Open a product to see your price, with free delivery to Glenn Dale.

  2. 2

    Choose a delivery date at checkout.As fast as 2 business days for most Glenn Dale addresses.

  3. 3

    Clear a drop spot.The truck tips the load where you mark it. Note low wires or branches when you order.

Not sure how much you need?

Enter length, width and depth and the calculator returns the cubic yards and tons for your project.

Open the calculator

Maryland Rock Supply handles gravel and aggregate delivery in Glenn Dale, MD, from CR-6 base to screened topsoil. Prince George's County ground is unconsolidated sand, silt, clay and gravel, so what you put down matters more than how much.

Order by the ton or the yard and we drop it where you need it.

Materials for Glenn Dale Projects

Most Glenn Dale jobs start with grade, not stone. Fill dirt raises low spots and backfills around foundations before anything else goes down. Screened topsoil rebuilds the lawn and beds after the work is done, and garden soil fills raised beds with something plants can actually root in.

Once grade is set, base and drainage take over. CR-6 is the standard Maryland base, a compacting blend of crushed stone down to dust for driveways, parking pads and paver sub-base. Crusher Run does similar work where you want a binding blend. For drainage, #57 stone and #8 crushed stone are the usual picks, and stone dust beds the pavers on top.

Decorative and sand rounds finish the job. Natural Pea Gravel suits walkways and play areas, river rock works in dry creek beds, and mason sand or concrete sand handle block work and paver bedding.

Ground and Conditions in Glenn Dale

Start with where the water goes. Summer thunderstorms, nor'easters and tropical rain soak this ground fast, and low, flat land near the Bay and tidal rivers sheds it slowly. On higher Top Soil it drains; in low clay spots it sits.

That drives your base depth. A thin base over wet clay heaves and ruts through repeated freeze-thaw, and Prince George's County frost depth runs 30 inches. Dig deeper, use CR-6, and compact in lifts.

If your lot sits within 1,000 feet of tidal water, Critical Area rules limit lot coverage, and gravel and stone surfaces count toward it. Plan your footprint before you order.

Base, driveway and paver work runs spring through late fall, with only short winter stoppages. Low sites near the shore can stay too wet to compact after a storm, so time the drop around the weather.

Delivery to Glenn Dale and the Surrounding Area

Order online and choose your material by the ton or the yard. Bulk loads arrive by dump truck and get placed as close to the work as the truck can safely reach.

Have the drop spot clear before the truck shows up. Mark any sprinkler heads, low wires or soft ground, and keep cars and bins out of the way. A clear, firm approach saves a wasted trip.

We deliver across Glenn Dale and Prince George's County, including Bowie, Clinton, College Park, Laurel and Suitland. Use the calculator to size the load, and pick a drop spot the dump truck can reach.

Questions Glenn Dale Buyers Ask

Can I order material by the ton for delivery in Glenn Dale?

Yes. Order CR-6, topsoil, sand and washed stone by the ton or by the cubic yard, whichever suits your takeoff. Bulk loads come out on a dump truck and are placed as close to the work area as access allows. Have the drop spot clear and the approach firm so the driver can get in and out without trouble.

What stone should I use for drainage in Glenn Dale?

For French drains and foundation drains, #57 stone is the standard choice, with #8 crushed stone for tighter spots and pipe bedding. Both are washed, so they shed water instead of holding it. On low ground near tidal water, where the soil stays wet, size the drainage layer generously and keep the outlet clear.

Order Topsoil, Fill and Stone for Your Glenn Dale Project

Maryland Rock Supply stocks the soil, fill, base and washed stone that Glenn Dale grading, driveway and drainage work calls for. Whether you are rebuilding a lawn, setting a paver patio or cutting in a French drain, the material is here and the delivery covers Prince George's County. Place your order online when you are ready.

Frequently Asked Questions

Common questions about gravel and aggregate delivery in Glenn Dale, MD

Can I order material by the ton for delivery in Glenn Dale?

Yes. Order CR-6, topsoil, sand and washed stone by the ton or by the cubic yard, whichever suits your takeoff. Bulk loads come out on a dump truck and are placed as close to the work area as access allows. Have the drop spot clear and the approach firm so the driver can get in and out without trouble.

What stone should I use for drainage in Glenn Dale?

For French drains and foundation drains, #57 stone is the standard choice, with #8 crushed stone for tighter spots and pipe bedding. Both are washed, so they shed water instead of holding it. On low ground near tidal water, where the soil stays wet, size the drainage layer generously and keep the outlet clear.

How is the material measured?

You can order by the ton or by the cubic yard, whichever suits how you plan the job. If you tell us the area you are covering and the depth you want, we will work the quantity out with you rather than leaving you to guess.